In this section
About us / News and media / News and media

News and media

Keep up to date with the latest news from Wellington Water and our mahi here.

 

For media queries contact 021 302 259 or email media@wellingtonwater.co.nz. 

22/06/2020
Major outage impacting Featherston water supply
Wellington Water, SWDC and Regional Public Health are working closely together towards lifting Featherston’s Boil Water Notice. The Notice needs to remain in place until testing confirms the water is safe, following the major breakage to the main on Friday.

Read More

19/06/2020
URGENT: All drinking water must be boiled in Featherston until further notice
All drinking water in Featherston must be boiled before drinking or using for food preparation or dental hygiene, due to the interruption of supply to Featherston following this morning’s outage.

Read More

2/06/2020
Mt Albert sludge pipeline repair success
Despite the additional challenge of the global pandemic both pipes were successfully relined by the end of May 2020, thanks to the multi-disciplinary team brought together to deliver this innovative repair.

Read More

31/05/2020
Victoria Street pipe burst update
The burst section of wastewater pipe in Victoria Street has now been repaired and everything is back up and running normally.

Read More

29/05/2020
Update on Victoria Street pipe burst
Good progress has been made to repair a wastewater pipe in Victoria Street in the Wellington CBD, after it burst last night.

Read More

26/05/2020
Update on work to reduce pollution in Titahi Bay
Wellington Water Ltd, on behalf of Porirua City Council, has a programme of work underway to improve Porirua’s wastewater treatment plant and pipe network, which will reduce pollution on the coast at Titahi Bay and in the Harbour.

Read More

24/05/2020
Sludge trucking ends as first stage of Mt Albert repair successfully completed
The first of the Mt Albert sludge pipelines to be repaired using a high-strength liner has been returned to full operation, following a comprehensive testing programme and reconnection to the wastewater network.

Read More

11/05/2020
Mt Albert sludge pipeline repair a step closer to completion
Wellington Water has this weekend installed a high-strength liner through the first of two 1.8km sludge pipelines beneath Mt Albert.

Read More

6/05/2020
Project work at alert level 3
Under Alert Level 3 we’ve been able to bring more of our projects back up to speed.

Read More

29/04/2020
Major work ready to start on Mt Albert sludge pipeline repair
A temporary speed hump installed in Adelaide Road today signals the start of major repair works on the Mt Albert high-pressure sludge pipelines, following the arrival in Wellington of a team of specialist international technicians and essential materials and equipment.

Read More